What to check before, during and after event truss use, including component identification, damage, connections and erected-system handover.

Plain-language definition

Understand the role before selecting equipment.

Inspection begins with identifiable components and continues through assembly, erected handover, event operation and post-use review. Records help track damage and remove questionable equipment from service.

This page explains the setup logic so organisers, agencies, venues and production suppliers can exchange a complete brief. It is educational guidance—not a capacity chart, installation instruction or approval for a real structure.

The practical decision

What must be resolved.

Check chords, braces, welds, connectors, pins, clips or bolts, deformation, corrosion, unauthorised repairs, identification and cleanliness before assembly; then inspect the complete support, connections and installed loads.

Names used in rental catalogues are useful for discovery, but the exact model, connection path, installation method and responsibility still need to be written into the project scope.

Open the related structure or setup page →

Information checklist

What a useful technical brief contains.

Project information

Inventory identification, manufacturer guidance, inspection history, damage reports, erection drawing, handover record, event duration, environmental exposure and any required documentation.

Always identify

  • Exact equipment and manufacturer series where applicable
  • Verified weights, dimensions and operating positions
  • Support, suspension and complete load path
  • Venue or site rules and current technical drawings
  • Access, lifting, work-at-height and exclusion zones
  • Installation, inspection, show and dismantling responsibilities

Setup process

Eight checks from brief to handover.

01Define the event and technical outcome
02Obtain the venue or site information
03Identify the exact compatible system
04Verify equipment data and positions
05Map supports, suspension and clearances
06Agree lifting, access and build sequence
07Record responsibility and change control
08Inspect and hand over the completed setup

How CK approaches it

Truss expertise in the context of the full event.

The structure is coordinated with the stage, LED, lighting, sound, branding, scenic surfaces, guest routes, venue access and operating schedule.

01 · Brief

Real inputs

Start with dimensions, equipment, weights, positions and site facts.

02 · Interface

Supplier scopes

Define who supplies, installs, connects, operates, inspects and removes each element.

03 · Delivery

Build sequence

Plan crew, transport, lifting access, exclusion zones, testing and rehearsal.

04 · Handover

Controlled changes

Inspect the final setup and review any later equipment or surface change.

Technical boundary

A guide explains; the project team approves.

A visual check by an unassigned person is not a substitute for the competent inspection or certification required by the equipment, venue, design or local project.

Published equipment ratings apply only under their stated conditions. The assembled structure, supported loads, geometry, connections, venue or ground, environmental effects and operating method must be considered together.

Review the truss safety setup guide →

Topic FAQ

Truss Inspection, Records & Certification questions.

What does truss inspection, records & certification mean in event production?

Inspection begins with identifiable components and continues through assembly, erected handover, event operation and post-use review. Records help track damage and remove questionable equipment from service.

What information should I provide about truss inspection, records & certification?

Inventory identification, manufacturer guidance, inspection history, damage reports, erection drawing, handover record, event duration, environmental exposure and any required documentation.

Can the final rigging arrangement be selected from this page?

No. A visual check by an unassigned person is not a substitute for the competent inspection or certification required by the equipment, venue, design or local project. The final method follows the exact equipment, manufacturer information, venue or site conditions and assigned competent people.

Who confirms the final truss and rigging method?

Responsibility depends on the project, venue and contract. The supplier, production team, venue or local rigger, competent inspector and engineer where required must have their scopes and approval route identified before installation.