How conical spigots, pins and bolt-together connections differ—and why compatible truss systems must never be mixed by appearance.
Plain-language definition
Professional truss series use connection systems defined by their manufacturer. Conical couplers or spigots and bolt-based systems have different components, assembly details and inspection points.
This page explains the setup logic so organisers, agencies, venues and production suppliers can exchange a complete brief. It is educational guidance—not a capacity chart, installation instruction or approval for a real structure.
The practical decision
Identify the exact manufacturer and series before choosing couplers, pins, clips, bolts, nuts, washers or corners. Dimensions that look similar do not prove compatibility.
Names used in rental catalogues are useful for discovery, but the exact model, connection path, installation method and responsibility still need to be written into the project scope.
Open the related structure or setup page →Information checklist
Manufacturer, model or series, section photos and identification, connection components, erection orientation, missing or replacement hardware and any damage history.
Setup process
How CK approaches it
The structure is coordinated with the stage, LED, lighting, sound, branding, scenic surfaces, guest routes, venue access and operating schedule.
Start with dimensions, equipment, weights, positions and site facts.
Define who supplies, installs, connects, operates, inspects and removes each element.
Plan crew, transport, lifting access, exclusion zones, testing and rehearsal.
Inspect the final setup and review any later equipment or surface change.
Technical boundary
Never improvise connector hardware, force misaligned joints or combine unrelated truss series. The complete assembled system follows the relevant manufacturer information.
Published equipment ratings apply only under their stated conditions. The assembled structure, supported loads, geometry, connections, venue or ground, environmental effects and operating method must be considered together.
Review the truss safety setup guide →Topic FAQ
Professional truss series use connection systems defined by their manufacturer. Conical couplers or spigots and bolt-based systems have different components, assembly details and inspection points.
Manufacturer, model or series, section photos and identification, connection components, erection orientation, missing or replacement hardware and any damage history.
No. Never improvise connector hardware, force misaligned joints or combine unrelated truss series. The complete assembled system follows the relevant manufacturer information. The final method follows the exact equipment, manufacturer information, venue or site conditions and assigned competent people.
Responsibility depends on the project, venue and contract. The supplier, production team, venue or local rigger, competent inspector and engineer where required must have their scopes and approval route identified before installation.
Continue learning
How entertainment chain motors, manual hoists, controllers and lifting plans relate to event truss installation.
Explore setup →02A practical comparison of powered chain motors and hand-operated chain blocks for lifting or positioning event structures.
Explore setup →03What approved venue points are, what a rigging plot communicates and what information is required before flown truss can be planned.
Explore setup →04Plain-language guidance to common entertainment rigging hardware and the information needed to specify it as a complete connection path.
Explore setup →05Understand working load limit, design factors, point and distributed loads, self-weight and why truss capacity is not one universal number.
Explore setup →06What to check before, during and after event truss use, including component identification, damage, connections and erected-system handover.
Explore setup →