Professional truss and rigging guide
How entertainment chain motors, manual hoists, controllers and lifting plans relate to event truss installation.
Plain-language definition
Hoists are lifting devices used within a planned rigging or erection method. Selecting one depends on the load, lift path, duty, control, suspension and complete system—not merely the motor capacity label.
This page explains the setup logic so organisers, agencies, venues and production suppliers can exchange a complete brief. It is educational guidance—not a capacity chart, installation instruction or approval for a real structure.
The practical decision
Confirm whether the task is erection-only lifting or supporting equipment during the event, how many lift points move together, required travel, control method and who operates the system.
Names used in rental catalogues are useful for discovery, but the exact model, connection path, installation method and responsibility still need to be written into the project scope.
Open the related structure or setup page →Information checklist
Truss plan, lifted load including cables and hardware, point positions, required travel and speed, power, controller, suspension points, installation method and operating schedule.
Setup process
How CK approaches it
The structure is coordinated with the stage, LED, lighting, sound, branding, scenic surfaces, guest routes, venue access and operating schedule.
Start with dimensions, equipment, weights, positions and site facts.
Define who supplies, installs, connects, operates, inspects and removes each element.
Plan crew, transport, lifting access, exclusion zones, testing and rehearsal.
Inspect the final setup and review any later equipment or surface change.
Technical boundary
A handheld pendant sometimes called a pickle is only a control interface; it does not replace coordinated motion setup, suitable equipment, inspection or competent operation.
Published equipment ratings apply only under their stated conditions. The assembled structure, supported loads, geometry, connections, venue or ground, environmental effects and operating method must be considered together.
Review the truss safety setup guide →Topic FAQ
Hoists are lifting devices used within a planned rigging or erection method. Selecting one depends on the load, lift path, duty, control, suspension and complete system—not merely the motor capacity label.
Truss plan, lifted load including cables and hardware, point positions, required travel and speed, power, controller, suspension points, installation method and operating schedule.
No. A handheld pendant sometimes called a pickle is only a control interface; it does not replace coordinated motion setup, suitable equipment, inspection or competent operation. The final method follows the exact equipment, manufacturer information, venue or site conditions and assigned competent people.
Responsibility depends on the project, venue and contract. The supplier, production team, venue or local rigger, competent inspector and engineer where required must have their scopes and approval route identified before installation.
Continue learning
A practical comparison of powered chain motors and hand-operated chain blocks for lifting or positioning event structures.
Explore setup →02How conical spigots, pins and bolt-together connections differ—and why compatible truss systems must never be mixed by appearance.
Explore setup →03What approved venue points are, what a rigging plot communicates and what information is required before flown truss can be planned.
Explore setup →04Plain-language guidance to common entertainment rigging hardware and the information needed to specify it as a complete connection path.
Explore setup →05Understand working load limit, design factors, point and distributed loads, self-weight and why truss capacity is not one universal number.
Explore setup →06What to check before, during and after event truss use, including component identification, damage, connections and erected-system handover.
Explore setup →