Project information
Venue route and floor data, work positions, required platform capacity, tool and material needs, working timetable, operator requirements and the agreed isolation area.
Professional truss and rigging guide
Setup access equipment, working zones and timing for truss assembly, focusing, cabling and inspection at height.
Plain-language definition
Personnel lifts provide work access; they are not hoists for truss or substitutes for a defined work-at-height system. Lift type and use depend on reach, floor, access route, load, operator and venue rules.
This page explains the setup logic so organisers, agencies, venues and production suppliers can exchange a complete brief. It is educational guidance—not a capacity chart, installation instruction or approval for a real structure.
The practical decision
Confirm working height and outreach, floor capacity, doorway and lift access, slope, overhead obstacles, public exclusion zone, battery or engine restrictions and when other suppliers need the same area.
Names used in rental catalogues are useful for discovery, but the exact model, connection path, installation method and responsibility still need to be written into the project scope.
Open the related structure or setup page →Information checklist
Venue route and floor data, work positions, required platform capacity, tool and material needs, working timetable, operator requirements and the agreed isolation area.
Setup process
How CK approaches it
The structure is coordinated with the stage, LED, lighting, sound, branding, scenic surfaces, guest routes, venue access and operating schedule.
Start with dimensions, equipment, weights, positions and site facts.
Define who supplies, installs, connects, operates, inspects and removes each element.
Plan crew, transport, lifting access, exclusion zones, testing and rehearsal.
Inspect the final setup and review any later equipment or surface change.
Technical boundary
Never use truss as an improvised ladder or allow a personnel lift to push, support or stabilise a structure outside its intended use.
Published equipment ratings apply only under their stated conditions. The assembled structure, supported loads, geometry, connections, venue or ground, environmental effects and operating method must be considered together.
Review the truss safety setup guide →Topic FAQ
Personnel lifts provide work access; they are not hoists for truss or substitutes for a defined work-at-height system. Lift type and use depend on reach, floor, access route, load, operator and venue rules.
Venue route and floor data, work positions, required platform capacity, tool and material needs, working timetable, operator requirements and the agreed isolation area.
No. Never use truss as an improvised ladder or allow a personnel lift to push, support or stabilise a structure outside its intended use. The final method follows the exact equipment, manufacturer information, venue or site conditions and assigned competent people.
Responsibility depends on the project, venue and contract. The supplier, production team, venue or local rigger, competent inspector and engineer where required must have their scopes and approval route identified before installation.
Continue learning
How entertainment chain motors, manual hoists, controllers and lifting plans relate to event truss installation.
Explore setup →02A practical comparison of powered chain motors and hand-operated chain blocks for lifting or positioning event structures.
Explore setup →03How conical spigots, pins and bolt-together connections differ—and why compatible truss systems must never be mixed by appearance.
Explore setup →04What approved venue points are, what a rigging plot communicates and what information is required before flown truss can be planned.
Explore setup →05Plain-language guidance to common entertainment rigging hardware and the information needed to specify it as a complete connection path.
Explore setup →06Understand working load limit, design factors, point and distributed loads, self-weight and why truss capacity is not one universal number.
Explore setup →