Professional truss and rigging guide

Ground Support vs Flown Truss.

Compare tower-supported production grids with truss suspended from approved venue rigging points.

Plain-language definition

Understand the role before selecting equipment.

Ground support carries a grid into towers, bases and the floor or ground. A flown system suspends truss through hoists and rigging hardware from approved venue points. Both require a complete load and access plan.

This page explains the setup logic so organisers, agencies, venues and production suppliers can exchange a complete brief. It is educational guidance—not a capacity chart, installation instruction or approval for a real structure.

The practical decision

What must be resolved.

Compare venue point availability, floor footprint, trim height, load distribution, stage and audience layout, erection access, hoist positions, schedule and indoor or outdoor conditions.

Names used in rental catalogues are useful for discovery, but the exact model, connection path, installation method and responsibility still need to be written into the project scope.

Open the related structure or setup page →

Information checklist

What a useful technical brief contains.

Project information

Venue rigging information, floor capacity or ground data, grid dimensions, equipment and positions, clearances, access, stage plan and the permitted installation method.

Always identify

  • Exact equipment and manufacturer series where applicable
  • Verified weights, dimensions and operating positions
  • Support, suspension and complete load path
  • Venue or site rules and current technical drawings
  • Access, lifting, work-at-height and exclusion zones
  • Installation, inspection, show and dismantling responsibilities

Setup process

Eight checks from brief to handover.

01Define the event and technical outcome
02Obtain the venue or site information
03Identify the exact compatible system
04Verify equipment data and positions
05Map supports, suspension and clearances
06Agree lifting, access and build sequence
07Record responsibility and change control
08Inspect and hand over the completed setup

How CK approaches it

Truss expertise in the context of the full event.

The structure is coordinated with the stage, LED, lighting, sound, branding, scenic surfaces, guest routes, venue access and operating schedule.

01 · Brief

Real inputs

Start with dimensions, equipment, weights, positions and site facts.

02 · Interface

Supplier scopes

Define who supplies, installs, connects, operates, inspects and removes each element.

03 · Delivery

Build sequence

Plan crew, transport, lifting access, exclusion zones, testing and rehearsal.

04 · Handover

Controlled changes

Inspect the final setup and review any later equipment or surface change.

Technical boundary

A guide explains; the project team approves.

Ground support is not the automatically safer fallback and flown truss is not approved because points exist. Each transfers loads through a different path that must be checked.

Published equipment ratings apply only under their stated conditions. The assembled structure, supported loads, geometry, connections, venue or ground, environmental effects and operating method must be considered together.

Review the truss safety setup guide →

Topic FAQ

Ground Support vs Flown Truss questions.

What does ground support vs flown truss mean in event production?

Ground support carries a grid into towers, bases and the floor or ground. A flown system suspends truss through hoists and rigging hardware from approved venue points. Both require a complete load and access plan.

What information should I provide about ground support vs flown truss?

Venue rigging information, floor capacity or ground data, grid dimensions, equipment and positions, clearances, access, stage plan and the permitted installation method.

Can the final rigging arrangement be selected from this page?

No. Ground support is not the automatically safer fallback and flown truss is not approved because points exist. Each transfers loads through a different path that must be checked. The final method follows the exact equipment, manufacturer information, venue or site conditions and assigned competent people.

Who confirms the final truss and rigging method?

Responsibility depends on the project, venue and contract. The supplier, production team, venue or local rigger, competent inspector and engineer where required must have their scopes and approval route identified before installation.