Professional truss and rigging guide
How touring or production rigging responsibilities may differ from venue or local rigging responsibilities on an event.
Plain-language definition
The production rigging role commonly develops or represents the show’s rigging requirements, while venue or local riggers work within building rules and local operations. Exact titles and responsibility vary by contract and location.
This page explains the setup logic so organisers, agencies, venues and production suppliers can exchange a complete brief. It is educational guidance—not a capacity chart, installation instruction or approval for a real structure.
The practical decision
Define who supplies the plot and calculations, approves points, installs house connections, provides hoists and hardware, supervises lifting, signs handover and responds to event changes.
Names used in rental catalogues are useful for discovery, but the exact model, connection path, installation method and responsibility still need to be written into the project scope.
Open the related structure or setup page →Information checklist
Responsibility matrix, venue rules, rigging and load plots, equipment list, contractor contacts, installation schedule, approval route and change-control process.
Setup process
How CK approaches it
The structure is coordinated with the stage, LED, lighting, sound, branding, scenic surfaces, guest routes, venue access and operating schedule.
Start with dimensions, equipment, weights, positions and site facts.
Define who supplies, installs, connects, operates, inspects and removes each element.
Plan crew, transport, lifting access, exclusion zones, testing and rehearsal.
Inspect the final setup and review any later equipment or surface change.
Technical boundary
Job titles alone do not prove authority, competence or scope. Use written responsibilities and the requirements of the actual venue and jurisdiction.
Published equipment ratings apply only under their stated conditions. The assembled structure, supported loads, geometry, connections, venue or ground, environmental effects and operating method must be considered together.
Review the truss safety setup guide →Topic FAQ
The production rigging role commonly develops or represents the show’s rigging requirements, while venue or local riggers work within building rules and local operations. Exact titles and responsibility vary by contract and location.
Responsibility matrix, venue rules, rigging and load plots, equipment list, contractor contacts, installation schedule, approval route and change-control process.
No. Job titles alone do not prove authority, competence or scope. Use written responsibilities and the requirements of the actual venue and jurisdiction. The final method follows the exact equipment, manufacturer information, venue or site conditions and assigned competent people.
Responsibility depends on the project, venue and contract. The supplier, production team, venue or local rigger, competent inspector and engineer where required must have their scopes and approval route identified before installation.
Continue learning
How entertainment chain motors, manual hoists, controllers and lifting plans relate to event truss installation.
Explore setup →02A practical comparison of powered chain motors and hand-operated chain blocks for lifting or positioning event structures.
Explore setup →03How conical spigots, pins and bolt-together connections differ—and why compatible truss systems must never be mixed by appearance.
Explore setup →04What approved venue points are, what a rigging plot communicates and what information is required before flown truss can be planned.
Explore setup →05Plain-language guidance to common entertainment rigging hardware and the information needed to specify it as a complete connection path.
Explore setup →06Understand working load limit, design factors, point and distributed loads, self-weight and why truss capacity is not one universal number.
Explore setup →